Jacoby Creek Bank Washout, Isolation with AquaDams
Initially, a 4ft tall, 15ft long Double Closed End AquaDam was installed on the creek-side of the breached creek bank wall. However, 2 days later, the City ordered a 12ft tall AquaDam to fill in the scour hole on the field side of the breached creek bank wall. A 5ft tall AquaDam was installed before the 12ft dam, to force the 12ft dam into the breach. ...
Bridge Isolation, Baytown, Texas 2017
Hurricane Harvey brought record rainfall to Texas. This record rainfall inundated all waterways, leading to erosion in many areas. A 16ft tall, 300ft long AquaDam, with 8ft tall support dams, was deployed to isolate the bridge and road areas, permitting dewatering for inspection and repair. ...
Pipeline Installation Site Isolation, Brownsville TX 2017
14,000ft of 4ft tall AquaDams were deployed in 4 days time, in order to provide site isolation at this site in Brownsville, Texas. ...