Water Controlling Water®
Pre installation
6-ft AquaDam delivered
6-ft AquaDam down bank
6-ft AquaDam filling
6-ft AquaDam filling 2
6-ft AquaDam filling 3
6 ft AquaDam filling 4
6-ft AquaDam filling 5
6-ft AquaDam in mud
6-ft AquaDam done
AquaDam prelocation
10 ft AquaDam on forklift
10 ft rope staging
10ft rope staging waterside
10ft starting point
10 ft down the bank
Pumps and anchor ropes
Rolling 10-FT AquaDam over mud
10-FT AquaDam in Thalweg
Starting bank
10-FT AquaDam filling
Tide coming in
10-FT AquaDam displaced via tidal influence
High tide won
Removing 10-FT AquaDam
Re-rolling 10-FT AquaDam
Re-rolling 10-FT AquaDam - 2
10-ft on trailer back to ADI
Unloading 10-FT AquaDam, 2nd try
10-FT fill tubes new location
Rolling 10-Ft AquaDam down bank
10-ft AquaDam filling - 2
8-FT AquaDam back up to 10-FT
10-FT AquaDam in Canal
8-ft AquaDam Filling
8-FT AquaDam Filling
Tying backup to main
8-FT AquaDam filling - 3
Booth AquaDam's filling
Both done
10 FT and 8 FT dry AquaDam
10 FT and 8 FT AquaDam eastward
10 FT and 8 FT westward
All 3 AquaDams are dry
All above dry
6 FT AquaDam dry