Dewatering for Bridge Pier Repair,
Concord River, Billerica, MA

Page 1

Both of these bridge piers were in need of repair. 

 

A suitable location was chosen to start the AquaDams®. Large boulders and obstructions had to be moved.  

 

This 5' high x 100' long AquaDam® is tied back to the trees and has been installed starting well up the bank, running out into the river, and making a left turn underneath the bridge.

 

Pages: 1 2 3 4