Overview of Stream Diversion:
Antelope Creek, Lincoln, CA

(Page 1)

A stream diversion through a man-made channel lined with polyethylene sheeting. The AquaDam® blocks off the old channel, diverting water flow into new diversion channel for installation of  a 48" sewage pipeline for a new housing development.

A 4' high x 40' long AquaDam® diverts the flow of Antelope Creek into the diversion channel. The AquaDam has been covered with a 6 mil poly that extends 15 feet out in front of it to provide a better seal to prevent a water boil that was occurring due to the sandy soil and deep water depth.  

A 3' high x 40' long AquaDam® has been installed at the lower end of the  original  stream channel. The open end of the AquaDam® extends 3' up the bank. This keeps the water from flowing out the open ends of the fill tubes.

Pages: 1 2 3 4 5 6 7 8