Walnut Creek, CA 2013
Partial Canal Dewatering

Click on photos to view a larger version
A shop vac was used in conjunction with the sump pump to dewater the work area. Walnut Creek, CA 2013
The AquaDam is forming a seal against the concrete wall, isolating the work area. Walnut Creek, CA 2013
Walnut Creek, CA 2013
Ropes supporting/stabilizing the AquaDams open end. Walnut Creek, CA 2013
Deep upstream water, AquaDam, and drying work area. Walnut Creek, CA 2013
Walnut Creek, CA 2013
Walnut Creek, CA 2013
Workers are brushing the water to the sump pump and shop vac for final dewatering. Walnut Creek, CA 2013
Dewatered work area behind the AquaDam, unrestrained water flow beyond the AquaDam. Walnut Creek, CA 2013
Pages: 1 2 3 4 5 6 7 Videos