Walnut Creek, CA 2013
Partial Canal Dewatering

Click on photos to view a larger version
Contractor provided installation crew taking a rest while the AquaDam continues to fill. Walnut Creek, CA 2013
A 30" channel remained to pass the flow of the channel. Walnut Creek, CA 2013
Water depth in the work area is only ~2". Walnut Creek, CA 2013
The AquaDam roll sits on top of the inflated portion of the AquaDam. Usually, it would be tied back for stability, but this AquaDam ended under a bridge, with no tie off points. Walnut Creek, CA 2013
Walnut Creek, CA 2013
Sandbags are placed to support the open end of the AquaDam, at the corner. Walnut Creek, CA 2013
The water levels have risen upstream of the AquaDam. The generator was raised to sit on top of a spare AquaDam. Walnut Creek, CA 2013
The AquaDam continues to fill; upstream water levels have stabilized. Walnut Creek, CA 2013
Walnut Creek, CA 2013
Walnut Creek, CA 2013
Pages: 1 2 3 4 5 6 7 Videos