Ontario, Canada 2010
Bridge Pier Isolation

Click on photos to view a larger version
This is a 16' high by 380' long AquaDam. It has been rolled up on a 12"-18" diameter log. Ontario, Canada 2010
A 10' high AquaDam was also packed along. Intended to be used to divert current flow away from the 16' high AquaDam during installation, it was not used. No current was found at the work site. Ontario, Canada 2010
Here is the work site, located in Ontario, Canada. Ontario, Canada 2010
The other side of the bridge. Ontario, Canada 2010
Underneath the bridge. Ontario, Canada 2010
The AquaDams have arrived. Ontario, Canada 2010
A large 60 ton crane was used to disembark the AquaDams. Ontario, Canada 2010
An excavator was used to move the rolled up AquaDam to the starting point on the bank. Ontario, Canada 2010