MBRAM City District One, Dubai UAE 2017
Crystal Lagoon Temporary Channel Isolation

Click on photos to view a larger version
At MBRAM City, District One, in Dubai, UAE, site contractors chose to purchase (2) sets of AquaDams to provide temporary lagoon channel isolation. This pictorial will focus on the first installation of the "Set B" AquaDams. Each Set consists of (1) 16'x300' long unit, (2) 12'x150' long units, (1) 4'x300' long unit, and 12 mil thick poly cover tarps for UV protection. MBRAM City District One, Dubai UAE 2017
First look at the installation path of the Set B AquaDams. MBRAM City District One, Dubai UAE 2017
The elevation berm rises about 8ft above the top of the lagoon channel, on both sides of the lagoon channel. These berms were need to provide the necessary elevation to the open ends of the AquaDams being installed. MBRAM City District One, Dubai UAE 2017
A crane with a spreader bar is used to lift the Set B 16ft dam from its storage area, to a waiting flatbed truck, which will haul the dam to the installation site. MBRAM City District One, Dubai UAE 2017
Unloading at installation site. MBRAM City District One, Dubai UAE 2017
Placement at top of starting berm. MBRAM City District One, Dubai UAE 2017
Loading the first of two 12ft dams. MBRAM City District One, Dubai UAE 2017
The 16ft primary dam is placed at the top of the berm, next to the 12ft support dam. MBRAM City District One, Dubai UAE 2017
The 16ft was pushed to unroll it down the lagoon side of the berm. MBRAM City District One, Dubai UAE 2017
At the top of the berm, the fill tubes are exposed. MBRAM City District One, Dubai UAE 2017