D. O .T. Bridge Pier Project
Fox River
Montgomery, IL (1997)
Page 1 of 1
Two 6' x 100' AquaDams® connected end-to-end.
The AquaDams® diverted the river around the bridge pier, allowing for dewatering of the work site.
Installation time for all five piers was six days.
AquaDam®
AquaDam®