Culver, Oregon 2018
Concrete Pour Isolation at Hydropower Station

Click on photos to view a larger version
The AquaDam continues to fill. It is now approximately 10ft tall. Note the "tipping sandbags" at the end of the wall. Culver, Oregon 2018
The AquaDam is full, or full enough, at approximately 11ft in height. The contractor can add water if needed. Culver, Oregon 2018
The hoses are disconnected and rolled up. Culver, Oregon 2018
Detail on junction between the end of the 12ft tall AquaDam and the sandbag wall face. Culver, Oregon 2018
Down the side of the dam. Culver, Oregon 2018
The fill tubes have been folded up and tied together. Keeping the fill-tubes higher than the rest of the dam is crucial for keeping water inside the AquaDam. Culver, Oregon 2018
Culver, Oregon 2018